New Fire Station Location is: 2650 S US 87 

3-23-22 Land donated for the new station. Thank you, Lord!

6-14-22 Driveway off of 87 South is almost complete.

7-14-22 Pad work has started!

8-18-22 Rebar and plumbing in place.

8-20-22 Blessed with base material for the fire station!

8-24-22 Poured main slab with great weather.

9-07-22 Poured approach and almost framed up!

9-14-22 Tin is on. Drone Shots added, thank you, Joey! 

10-11-22 Rainwater storage completed, let it rain!

10-20-22 Insulated and painted.

12-06-22 Nearing completion!

12-07-22 Not open yet, but the lights are on.

12-22-22 Open For Calls!

3-27-23 Septic system completed. Thank you, Sefcik Construction, for your generous donation!

4-26-23 Station sign installed. Thank you, FASTSIGNS!

 

  • Thank you Sefcik Construction for your donation of our septic system!
  • Wall VFD Station 2
    Wall VFD Station #2
  • Wall VFD Sign Provided by FASTSIGNS of San Angelo
    Wall VFD Station #2 sign installed, Thank You FASTSIGNS!